Project List
2009 Former biwater works, Clay Cross
Scope: Process demolition stockpiles and crush to suitable gradings fully in accordance with WRAP protocol.
Client: DSM Demolition Limited.
Engineer/Contractor: AIG Remediation
Value: £145,000.00
2009 Former biwater works, Clay Cross
Scope: Process demolition stockpiles and crush to suitable gradings fully in accordance with WRAP protocol.
Client: DSM Demolition Limited.
Engineer/Contractor: AIG Remediation
Value: £145,000.00
2009 Uxbridge Business Park
Scope: Installation of Traffic Control measures including all necessary traffic management arrangements.
Client: Goodman Limited.
Value: £24,000.00
2009 Newport Road, Cardiff
Scope: Strip out of 3 no. retail units including floor slabs and reinstate following piling works from within building.
Client: Keller Ground Engineering.
Engineer/Contractor: RPS Burks Green
Value: £385,530.00
2009 Birkin Lane, Grassmore
Scope: Demolition of bungalow including asbestos removal and site preparation.
Client: Bloor Homes.
Engineer/Contractor:
Value: £15,300.00
2009 Normacot, Stoke-on-Trent
Scope: Removal of Japanese knotweed and break out and process obstruction in ground for residential development.
Client: Frank Haslam Milan Limited
Engineer/Contractor:
Value: £36,000.00
2008 Hatfield Bus Stops
Scope: Form bus lay-bys and install services and new bus shelters.
Client: Hertfordshire University.
Engineer/Contractor: Baynham & Meikle.
Value: £185,000.00
2009 Post Office Distribution Depot
Scope: Maintain traffic whilst carrying out reinforced slab strengthening works to entrance way.
Client: Hatfield Business Park Limited.
Engineer/Contractor: Baynham & Meikle.
Value: £18,000.00
2007-2008 Folkestone
Scope: Install 6 m deep land drainage to reduce water table to allow site to be developed.
Client: Persimmon Homes.
Engineer/Contractor: Keller Ground Engineering.
Value: £450,000.00
2009 Folkestone
Scope: Earthworks and pile trimming works as final phase of site preparation works prior to development.
Client: Persimmon Homes.
Engineer/Contractor: Keller Ground Engineering.
Value: £232,000.00
2009 Croome Park, Croome
Scope: Site preparation and construction of new car parking facility.
Client: The National Trust.
Engineer/Contractor: Baynham & Meikle.
Value: £158,000.00
2009 Hinckley Club for Young Persons
Scope: Site preparation and cut and fill works.
Client: ROK Building Limited.
Engineer/Contractor: WM Saunders Partnership.
Value: £28,500.00
2007 Pheonix Way, Coventry
Scope: Site remediation with temporary canal crossing including constructing bridge abutments and 7m high reinforced earth embankment.
Client: Blue Riband Properties.
Engineer/Contractor: Mark Brock Consulting Engineers.
Value: £535,000.00
2009 Tipton
Scope: Site clearance of all substructure obstructions, locate and indentify contamination. Regrade site upon completion.
Client: Harrow Estates.
Engineer/Contractor: Wardell Armstrong.
Value: £68,000.00